Jib crane operation manual






















If a specific usage pattern cannot be determined, the crane operator or maintenance engineer should estimate when the crane should be lubricated. Generally, a jib crane operating 24 hours per day, seven days per week, requires lubrication once a week. A jib crane operating eight hours per day, five days perFile Size: 1MB. FOUNDATION PILLAR JIB CRANE. Foundation Mounted Jib Cranes JF Series. Click below for Installation, Operation Maintenance Manual. Download Manual – PDF. If the jib crane is no longer to be used the main user is invited to deliver, with the hoist, this manual and the relevant documentation enclosed with it (declarations, schemes, control register etc.) Conformity with safety regulations The jib crane was designed and produced followingthe “Essential Safety Requirements” of.


Jib crane A crane with an arm which slews on a fixed bearing at one end. The hoist travelling movements, along the arm or around the pivot, are usually manually controlled. Wall-mounted jib crane A jib crane in which the jib arm is fixed to a wall (concrete) or column (concrete/steel) which is. part of the building structure. FOUNDATION PILLAR JIB CRANE. Foundation Mounted Jib Cranes JF Series. Click below for Installation, Operation Maintenance Manual. Download Manual – PDF. Installation, Operation, Maintenance Manual. Month. Year Gorbel ® Dealer Date. Wall Mounted. Articulating Jib Crane. Gorbel ® Customer Order No. / Serial No. ® AJ Distributed by Ergonomic Partners Sales@www.doorway.ru www.doorway.ru Tel: ()


Use of spare part other than original spare parts from Pritec Vaculyft. Safety instructions. The maximum load is specified on the crane boom. AP MANUAL EXTENSIONS. FLY-JIB. WINCH. CRANES WITH WINCH AND FLY-JIB. 7. LIFTING CAPACITY AND LIFTING CAPACITY DIAGRAMS. Installation, Operation,. Maintenance Manual. Month. Year. Gorbel® Dealer. Date. Freestanding. Motorized Jib Crane. Gorbel® Customer Order No.

0コメント

  • 1000 / 1000